Our Story
IN 2018, WE HAD A WELL-KNOWN, MIDLAND-BASED OPERATOR APPROACH US WITH A PROBLEM.
Like most operators out of that area, they had been using an energy broker. However, they were struggling with trying to set up a PME for close to a year and getting no communication or answers from anyone. The operator decided to hand over the project to us, and within four and a half weeks, we had power flowing to the site.
WHAT WE DO
WE UNDERSTAND THE CHALLENGES OF CONNECTING TO THE GRID IN WEST TEXAS.
We manage and oversee multiple facets of infrastructure projects. This includes designing and installing electrical lines (poles, wires, transformers), designing and constructing sub-stations and providing temporary or permanent power generation.